Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Characteristics of some typical port and terminal in Haiphong, Assignments of Logistics

compare the features of some typical port

Typology: Assignments

2021/2022

Uploaded on 10/31/2023

quy-nguyen-thi-kim-1
quy-nguyen-thi-kim-1 🇻🇳

3 documents

1 / 3

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CẢNG CONTAINER QUỐC TẾ TÂN CẢNG -HẢI PHÒNG (TC HICT
Total area:57ha
Capacity: 1,100,000TEUs/year
Shipable tonnage: 160,000DWT
Wharf length: 02 main berths with length of
750m; 01 barge berth with length of 150m.
Depth in front of the berth: -16m
Riverbed depth: -14m
02 forklifts
720 sockets
33 tractors
08 STS crane
24 RTGs
TAN CANG PORT -128 (TRANSFER PORT TO TC-HICT) Location: Hai An district, Hai Phong
city
Total area: 16.5ha
Shipable tonnage: 15,000DWT
Wharf length: 422m (01 berth +02 barge)
Depth in front of berth: -8.2m
Riverbed depth: -6.2m
500 sockets
7 Gantry cranes
8 RTGs
TAN CANG PORT –189 (TRANSFER PORT TO TC-HICT) Location: Hai An district, Hai Phong
city
Total area: 10.5ha
Shipable tonnage: 15,000DWT
Port length: 160m
Depth in front of berth: -8.2m
Riverbed depth: -7.6m
1 Frame crane
5 RTGs
216 socket
1 STS crane
LOGISTICS SYSTEM
Freight forwarding
Project loading and unloading service
Clearance declaration
Air Transport
Warehouse service
Barge service
Water transportation
Road transport service
Rail transport
TAN VU TERMINAL
Number of berth: 5
Total length of berth (m): 980.6
Depth alongside (m): -9.4
Gantry crane (QC): 8
Portal Crane (PC)- Slewing crane: 7
Wheel gantry crane (RTG): 30
Wheel crane: 1
Reach stackers: 8
Forklift of all kinds: 11
Container tractor trailer or semi: 41
Electronic weighing brige 120 Ton: 2
Reefer plugs: 1,500
Eport+ Smart Gate
Storage:
Total: 550,000 m 2 : CFS facilities: 4,800m2 ,
container yard: 480,000m2
DINH VU TERMINAL
Service:
Port operation service
Loading and unloading, delivery of goods
Warehouses and Warehouses CFS
Electronic scale 100 tons
Container repair and cleaning
Electronic customs connection
Main business lines of the port:
- Services of loading and unloading, delivery,
storage and preservation of goods, warehousing
business
- Transport agency services; import-export
services, multi-modal goods transportation;
- Providing maritime services, towing services,
ship support
pf3

Partial preview of the text

Download Characteristics of some typical port and terminal in Haiphong and more Assignments Logistics in PDF only on Docsity!

CẢNG CONTAINER QUỐC TẾ TÂN CẢNG -HẢI PHÒNG (TC HICT

Total area:57ha Capacity: 1,100,000TEUs/year Shipable tonnage: 160,000DWT Wharf length: 02 main berths with length of 750m; 01 barge berth with length of 150m. Depth in front of the berth: -16m Riverbed depth: -14m 02 forklifts 720 sockets 33 tractors 08 STS crane 24 RTGs TAN CANG PORT -128 (TRANSFER PORT TO TC-HICT) Location: Hai An district, Hai Phong city Total area: 16.5ha Shipable tonnage: 15,000DWT Wharf length: 422m (01 berth +02 barge) Depth in front of berth: -8.2m Riverbed depth: -6.2m 500 sockets 7 Gantry cranes 8 RTGs TAN CANG PORT –189 (TRANSFER PORT TO TC-HICT) Location: Hai An district, Hai Phong city Total area: 10.5ha Shipable tonnage: 15,000DWT Port length: 160m Depth in front of berth: -8.2m Riverbed depth: -7.6m 1 Frame crane 5 RTGs 216 socket 1 STS crane LOGISTICS SYSTEM Freight forwarding Project loading and unloading service Clearance declaration Air Transport Warehouse service Barge service Water transportation Road transport service Rail transport TAN VU TERMINAL Number of berth: 5 Total length of berth (m): 980. Depth alongside (m): -9. Gantry crane (QC): 8 Portal Crane (PC)- Slewing crane: 7 Wheel gantry crane (RTG): 30 Wheel crane: 1 Reach stackers: 8 Forklift of all kinds: 11 Container tractor trailer or semi: 41 Electronic weighing brige 120 Ton: 2 Reefer plugs: 1, Eport+ Smart Gate Storage: Total: 550,000 m 2 : CFS facilities: 4,800m^2 , container yard: 480,000m^2 DINH VU TERMINAL Service: Port operation service Loading and unloading, delivery of goods Warehouses and Warehouses CFS Electronic scale 100 tons Container repair and cleaning Electronic customs connection Main business lines of the port:

  • Services of loading and unloading, delivery, storage and preservation of goods, warehousing business
  • Transport agency services; import-export services, multi-modal goods transportation;
  • Providing maritime services, towing services, ship support

Total length of pier: 425m Number of berths: 2

  • C1:236.8m
  • C2:188.2m Quality management system according to ISO 9001:2015,
  • Environmental management system according to international standard ISO 14001:2015. Warehouse Total port area: 24 Ha
  • Container yard area: 22 Ha ~ 12,500 TEU
  • Refrigerated container system: 12 units x 24 containers
  • Parking area for cars: 12,000m2~ 800 to 1,000 cars
  • Intestinal area: 6,400m
  • Area of CFS warehouse: 1,800m
  • General warehouse area: 1,800m Technology and equipment Frontline equipment
  • 02 STS (Ship-to-shore) gantry cranes: lifting capacity 50 tons, river reach: 35m.
  • 01 Gottwald MHK 280E wheel crane: lifting capacity 100 tons.
  • 04 Cranes with lifting capacity from 40 to 45 tons, reach 32m. Front and rear equipment
  • 08 RTG (Rubber-Tired-Gantry) gantry crane: lifting capacity 40 tons.
  • 08 Reachstacker forklifts with lifting capacity of 45 tons.
  • 02 Forklifts with a lifting capacity of 13 tons.
  • 05 Forklift forklifts with lifting capacity from 3 to 10 tons.
    • 20 specialized tractors for transporting Containers in the port.
    • 02 Electronic scales of 100 tons. Information technology system
    • Real-time container operation management system;
    • Wifi system covers the whole port;
    • Industrial computer system equipped on forklift, RTG and delivery staff, data entry and transfer in real time
    • GPS-RTK system equipped on the forklift, RTG locates the exact location of the container- -
    • Surveillance camera system is installed throughout the port to serve the operation, inspection, control, identification of license plates and container numbers..... Reception capacity Total of 2 bridges with a total length of 425m
    • Types of goods exploited: Container goods, general goods, civil and specialized cars
    • Mining output: over 600,000 TEU/year, 12,000 -12, teu/week
    • Largest vessel size: 50,000 DWT.

NAM DINH VU TERMINAL

Pier length: 880m

Design capacity: 1.2 mil TEUs/year

Depth in front of berth: -8.5m

STS Crane: 10

RTG: 21

Reach stacker: 9

Reefer plug: 1,

Warehouse area: 42 hectares

Maximum vessel size offload: 48,000 DWT

Scale: 7 container terminals on a total area

of more than 65 hectares

Pier length: 1.5 km

Capacity: nearly 2 million Teus and 3

million tons/year